UPS installation plan and unpacking

Use the following basic sequence of steps to install the UPS:
1.
Create an installation plan for the UPS system.
2.
Prepare your site for the UPS system.
3.
Inspect and unpack the UPS cabinet.
4.
Unload and install the UPS cabinet and wire the system.
5.
Complete the installation checklist provided in Section
6.
Have authorized service personnel perform the preliminary operational
checks and startup.
Note: Startup and operational checks must be performed by an authorized
Eaton Customer Service Engineer or by other qualified service personnel
authorized by Eaton, or the terms specified in the Warranty (see Chapter
become void. This service is offered as a part of the sales contract for the
UPS. Contact service in advance (usually a two-week notice is required) to
reserve a preferred startup date.
4.1
Before you install the UPS system, read and understand how these instructions
apply to the system that you are going to install. Use the procedures and
illustrations in Section
system.
©
Eaton Corporation plc 2018. All rights reserved.

Creating an installation plan

4.3
and Chapter
5
to create a logical plan for installing the
Revision: 005
Document ID: P-164000493
User's and installation guide
4.2
.
10
)
33 (117)

Advertisement

Table of Contents
loading

This manual is also suitable for:

93ps ups 8-40 kw

Table of Contents