Porsche 928 Workshop Manual page 314

Hide thumbs Also See for 928:
Table of Contents

Advertisement

928
Engine
- Cooling
19
Function-testing
the output
stage
1.)
Plugs
I and II
must be connected
to the control
unit.
4.)
Function-testing
the control
signal
of the output
stage.
Reconnect
output-stage
plug
connector.
Remove cover
from
plug
I of control
unit.
2.)
Checking
voltage
supply.
Connect
voltmeter
to pin 3
(ground)
and pin 4 (plus)
of
the fan output-stage
plug
connector.
Reading:
battery
voltage
3.)
Connect
voltmeter
to pin 3
(ground)
and pin
2 (plus).
Ignition
on
Reading:
battery
voltage
c
'.,
Engine
temperature-z79'C(175"F)
Measure
the voltage
with
an
analog
voltmeter
with
an
external
resistance
(Ri)
100 k0hm.
Pin 7, plug
I (ground)
and pin 6
(plus).
Ignition
on
Press AC button
Set the air-distribution
slide
switch
to up/down.
Reading:
approx.
7 V
0
Printed
in Germany-XX,1988
Function-testing
the
19
- 25
Output
Stage

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents