Installing Camshaft Drive Belt And Adjusting Timing - Porsche 928 Workshop Manual

Hide thumbs Also See for 928:
Table of Contents

Advertisement

15
Engine/Cylinder
Head,
Valves
928
INSTALLING
CAMSHAFT
DRIVE BELT AND ADJUSTING
TIMING
Note
:
Make sure new drive belts are retightened
after driving car approx.
1,000 km
Installing
Camshaft
Drive
Belt
1. Line up TDC mark on vibration
damper with red
indicator on cover by turning crankshaft clock-
wise.
Note:
Vibration
damper must be removed again for instal-
lation of the camshaft drive belt afterwards.
2. Turn both camshafts until notches in both camshaft
sprockets are aligned with marks cast on the camshaft
bearing caps.
Install camshaft drive belt, always pre-loaded by
hand, in the following
order.
First on sprocket (11. oil pumpsprocket
(2).
then over sprocket (31 of left camshaft (cyl. 5
through 8). bottom of water pump sprocket (4)
and on sprocket (51 of cyl. 1 through 4. and
finally over camshaft drive belt tensioning
roller
(6).
Note:
Should the teeth of a hand-tightened
camshaft drive
belt not match the sprocket pitch accurafelv
enough, turn pertinent
camshaft sprocket counter-
clockwise carefully
until teeth match.
15.14
Installing Camshaft Drive Belt and Adjusting
Timing
VII, 1983 - Printed in Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents