Porsche 928 Workshop Manual page 262

Hide thumbs Also See for 928:
Table of Contents

Advertisement

928
Engine/Cylinder
Head, Valve
Drive
15
4.Turn
crankshaft
until
cylinder
No. 6 is at 20" after
TDC.
5.Block
camshaft
gears
by instal-
ling
3 M 5 x 15 auxiliary
bolts
then
tightening
M 10 bolt
to
65 Nm (47 ftlb).
6.Turn
crankshaft
through
2 more
revolutions
and recheck
setting.
Specified
value:
1.6 + 0.1 mm,
cylinder
No. 6 20" after
TDC.
Readjust
if
necessary.
7.Once adjustment
is completed,
unscrew
and remove temporary
M 5
x 15 bolt.
Cylinder
bank 5-8
8.Turn
crankshaft
until
cylinder
No. 6 is at TDC and check
set-
tings
of cylinder
bank 5-8 as
described
above (cylinder
bank
l-4).
Specified
value
2.0 +
0.1 mm, cylinder
No. 1 20" after
TDC.
CHECKING AND ADJUSTING CAMSHAFT
SETTING
87 MODELS ONWARD
ENGINE TYPE M 28. 41/42
Note:
Installation
of new camshafts
in
type
M 28. 41/42
engines
as of
model year
87 has changed
the valve
timing.
The new camshafts
are
recognizable
because
they
have no
rear
journals.
Adjusting
Cylinder
bank l-4
Testing
and adjusting
specifi-
cation:
1.8 +
0.1
mm
-
Cylinder
bank 5-8
Testing
and adjusting
specifi-
cation:
2.0 + 0.1 mm
-
Adjustment
of the camshafts
follows
the same sequence
as
described
on p. 15 - 134.
Printed
in Germany
- XIII,
1986
Checking
and Adjusting
Camshaft
15 - 135
Setting

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents