5.20.3 Test Control

Any input may be placed on 'soak test' to prevent it from generating an alarm. If the input triggers
whilst the system is armed, it will indicate the activation and enter the details in the system log. You
can also enter the number of days you would like the soak test to last, after this period the inputs
will be active.

5.20.4 Test Bell

Any outputs programmed as Any Siren or Any Strobe will be activated in this test.

5.20.5 Do Battery Load Test

Battery Test
The system performs a check of the battery operation every 10 seconds, by dipping the power
supply voltage momentarily, and measuring the system voltage. If the battery voltage measured is
below 12.0V, or the battery fuse has failed, a 'BATTERY FAULT 100' warning will be generated.
Battery Load Test
PCX Systems may be programmed to perform an automatic battery load test at every power
supply at 07.00am each day. This will drop the power supply voltage below the battery voltage,
whilst monitoring the system diagnostics.
The test will NOT take place if:
The End Station bell and strobe PGMs are live
The system is in Engineer Mode
Any battery faults exists
Any mains fault exists
The site option is not selected
If the test has already started, it will be aborted if any of these conditions apply, other than entry
into Engineer Mode. If the test is aborted, it will NOT be performed until the next day.
This is selected in SITE OPTIONS under "Do Battery Load Test". The test may also be performed
as required, under engineer control.
5.20.6 Test PGMs
The engineer can test all the Programmable Outputs on the End Station and the ROX's. This test
can also be used to test the ATE pins, all you need to do is select the outputs you have chosen for
the pins and test them, the signal will be then sent out on both the programmable outputs and the
ATE pins.
Please note that some ARC's require that you signal events continuously, therefore 'Force Arm On
st
1
Input' should be used. Please see page: 12

5.20.7 Test PHC Communications

Before SMS signalling can be used, it must be initialised by communication with the Pyronix Host
Computer (PHC). Once the test has completed, SMS texting can be performed.
RINS868-6
PLEASE NOTE ALL PHC CALLS COST 50p PER CALL
PCX 256 PROGRAMMING MANUAL
Page: 51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents