12-40
Doors
EC718/EC718RV EC715/EC715RV 10/2009
Body, Sheet Metal and Painting
2.
Install the front door.
3.
Connect the front door wiring harness connector and the
dust cover.
4.
Install the front door check link.
5.
Close the front door and inspect the door Clearance,
adjust if necessary.
6.
Install the front door hinge to the front door retaining bolts.
Torque: 25 Nm (Metric) 18.5 lb-ft (US English)
7.
Install the front fender.
8.
Install the front fender liner.
9.
Install the front wheel.
10. Lower the vehicle.
12.5.2.2 Front Door Check Link Replacement
Removal Procedure:
1.
Remove the front door trim panel. Refer to
Side Door Trim Panel
2.
Remove the front door check link retaining blots (2 M6, 1
M8).
3.
Remove the front door check link from inside of the front
door.
12.9.1.12 Front
Replacement.