Waters Prep Series Installation And Maintenance Manual page 80

Table of Contents

Advertisement

Installing an analytical column
To install an analytical column:
1.
Loosen the clamps at any available column location and slide the column
holder apart.
2.
Slide the column in place and tighten the clamps to secure it in position.
3.
Prepare a length of 0.009-inch ID tubing to extend between the
connector labeled Small Scale – To Column Inlet and the column inlet.
Prepare another to extend between the connector labeled Small Scale –
From Column Outlet and the column outlet.
4.
Install compression fittings on each end of the tubing as described in
"Liquid line connections" on page
5.
Tighten the fittings at all column connectors.
Installing the prep column
To install the prep column:
1.
Loosen the clamps at the prep column location and slide the column
holders apart.
2.
Slide the column into place, and tighten the clamps to secure it in
position.
3.
Prepare a length of 0.040-inch ID tubing to extend between the
connector labeled Large Scale – To Column Inlet and the column inlet.
Prepare another to extend between the Large Scale – From Column
Outlet connector and the column outlet.
4.
Install compression fittings on each end of the tubing (see
connections" on page
5.
Tighten the fittings at all column connectors.
Using an M-1000 PrepPak module
To use M-1000 PrepPak module:
1.
Assemble the PrepPak module as shown in its operator's guide.
2-46
Installing the System
2-21.
2-21).
"Liquid line

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hplc

Table of Contents