Waters Prep Series Installation And Maintenance Manual page 78

Table of Contents

Advertisement

2.
Install compression fittings on each end of the tubing as described in
"Liquid line connections" on page
3.
Tighten fittings at all connectors.
Using an M-1000 PrepPak module
To use M-1000 PrepPak module:
1.
Assemble the M-1000 PrepPak module as described in its operator's
guide.
2.
Place the M-1000 PrepPak module beside the PrepLC system.
3.
Prepare a length of 0.040-inch ID tubing to extend between the column
outlet port (port 3 on the Rheodyne injector connector) and the column
inlet on the front of the bottom end cap, and one that reaches between
the column outlet on the top end cap (see the
column" on page
4.
Install compression fittings on each end of the tubing as described in
"Liquid line connections" on page
5.
Tighten the fittings at all connectors.
Connecting to a Radial Compression Module (RCM)
To install an 8 × 10 mm (small-scale) or 25 × 10 or 40 × 10 mm (large-scale)
RCM:
1.
Place the RCM to the left of the PrepLC system.
2.
Prepare the inlet tubing.
For an 8 × 10 mm (small-scale) RCM, prepare a length of 0.020-inch ID
tubing that reaches between the column outlet port, port 3 on the
Rheodyne injector, and the RCM inlet.
For an 8 × 10 mm RCM, prepare a length of 0.020-inch ID tubing that
reaches between the detector and the RCM outlet.
For a 25 × 10 or 40 × 10 mm RCM, prepare the length of 0.040-inch ID
tubing that reaches between the detector and the RCM outlet.
3.
Install compression fittings on each end of the tubing as described in
"Liquid line connections" on page
2-44
Installing the System
2-21.
2-43) and the detector.
2-21.
2-21.
figure "Attaching the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hplc

Table of Contents