Commissioning The Cpx Terminal On The Interbus - Festo CPX-FB6 Manual

Cpx fieldbus node
Hide thumbs Also See for CPX-FB6:
Table of Contents

Advertisement

2. Commissioning
2.3

Commissioning the CPX terminal on the Interbus

2-54
In order to avoid errors (e.g. configuration and parametrisa-
tion errors) during commissioning:
Please observe the general commissioning instructions in
the CPX system description.
Check the DIL switch settings before using and replacing
CPX terminals.
Observe the instructions on switching on the power sup-
ply in section 2.1.5.
Check the configured address range (process data and
assigned input and output bytes). If necessary, test the
I/Os.
Check the address assignment of the I/Os on the CPX
terminal. In order to do this, you can, if necessary, force
the I/Os (see CPX system description).
Make sure that the desired parametrisation of the CPX
terminal in the initialisation phase or after fieldbus inter-
ruptions is carried out by the interface module. This en-
sures that if the CPX terminal is replaced, the new termin-
al will also be operated with the desired parameter
settings.
Check the parametrisation on a random basis, e.g. with
the function "CMD device parametrisation" or with the
handheld.
The M/TR LED signals communication via the PCP chan-
nel. You can then ascertain whether parametrisation via
the PCP channel has taken place, e.g. in the start-up
phase.
Festo P.BE-CPX-FB6-EN en 1207c

Advertisement

Table of Contents
loading

Table of Contents