Installation
3.7 Trial operation
Prepare the machine for trial operation by following the INSTRUCTIONS FOR
USE. The instructions describe the measures that must be taken to prepare the
machine for operation.
3.7.1 Start-up schedule
This should be completed and signed by the customer on start-up.
Machine type:
Machine serial number:
Installation date:
Read the installation and user manuals carefully. Then check the following points:
Customer:
Address for visitors:
Postcode + Town/City:
Telephone:
Contact:
Dealer:
Telephone:
Contact:
Start-up company:
Telephone:
Contact:
Service company:
Telephone:
Detergent supplier:
Telephone:
End-user signature:
Name (in capitals):
WD-12
25
Rev. 2.0 (201706)