Installation instructions
3.7 Trial operation
3.7.1 Start-up schedule
Prepare the machine for trial operation with the help of OPERATING INSTRUC-
TIONS. The instructions describe the measures that must be taken to prepare the
machine for operation.
This should be completed when the machine is started up and used.
Machine type:
Machine serial number:
Installation date:
Read the installation and user manuals carefully. Then check the following points:
1. Check:
•
Water and waste pipe connections
•
That the machine is evenly balanced
•
That the closed doors are in line
•
That the benches, conveyor bend etc. are correctly fitted
•
Detergent and drying agent
•
That the filters, level pipe, outlet seal, filter tray and curtains are in position
•
The mini-switches for all the heating elements must be in the OFF position.
•
That the overheating protection device is reset
2. Filling the machine:
•
Close the doors
•
Switch on the power switch and press 0/1
•
Fill the machine with water in accordance with the OPERATING INSTRUC-
TIONS
Note: It takes between 5 and 30 minutes to fill the system. The booster
heaters fill automatically when the doors are closed. The machine has a fill-
ing check function for the booster heaters. When the function is activated,
a check is carried out to ensure that the booster heaters are full of water,
before the element is switched on.
Note: If the filling process is interrupted using the main switch, the check
starts again from the beginning.
•
When the filling check has been completed and all the tanks are full, the
mini-switches for the booster heaters switch on.
3. Check the setting of the reference values:
•
All the reference values have been set to the recommended values on de-
livery
•
Check that the motor cut-off switch for the infeed and outfeed conveyors
have been set correctly
WD-11
touch
21
Rev. 00 (202310)