Delayed, safe power down & reboot: This is the same switch off and then on sequence as for the Safe power
l
down & reboot command, but postponed by the number of seconds programmed in the Off Delay parameter.
Delayed On: This is the same switch on sequence as for the Immediate On command, but postponed by the
l
number of seconds programmed in the On Delay parameter.
Selecting Save saves the Off Delay, Toggle Duration, and On Delay parameters on the card.
UPS Weekly Schedule Programming
Select Weekly Schedule from the menu bar to set up the timing of specific weekly actions (see Figure 22).
Figure 22. Weekly Schedule Page
The weekly schedule enables the administrator to optimize power consumption or program a reboot of the
protected equipment at a set time.
In a shutdown sequence, the Eaton UPS Management Software connected to the card is informed, ensuring
that each machine is shut down correctly before the UPS output is switched off. You can program up to seven
UPS shutdown sequences in one week, with a minimum shutdown delay of 30 minutes.
The On/Off sequences are valid only if the card's time has been set properly.
NOTE
For security purposes, the administrator must click
name and password to save modifications or run commands. The default user name
and password are both
NOTE
UPS configuration can prevent the shutdown and restart commands from running
properly. Refer to the UPS user's guide for more information.
NOTE
For security purposes, the administrator must click
name and password to save modifications or run commands. The default user name
and password are both
Eaton Network Card-MS User's Guide P-164000100—Rev 1 www.eaton.com/powerquality
admin
.
admin
.
Configuring the Card
Save
and enter the admin user
Save
and enter the admin user
28
Need help?
Do you have a question about the Network Card-MS and is the answer not in the manual?