Mechanical Installation; Before Starting - Danfoss ADAP-KOOL AKD 102 Operating Instructions Manual

Hide thumbs Also See for ADAP-KOOL AKD 102:
Table of Contents

Advertisement

Mechanical Installation

4 Mechanical Installation

4.1 Before starting

4.1.1 Checklist
When unpacking the frequency converter, ensure that the unit is undamaged and complete. Use the following table to
identify the packaging:
A2
Enclosure type:
(IP 20-21)
Unit size (kW):
200-240 V
1.1-3.0
380-480 V
1.1-4.0
Table 4.1 Unpacking table
Please note that a selection of screwdrivers (phillips or cross-thread screwdriver and torx), a side-cutter, drill and knife is also
recommended to have handy for unpacking and mounting the frequency converter. The packaging for these enclosures
contains, as shown: Accessories bag(s), documentation and the unit. Depending on options fitted there may be one or two
bags and one or more booklets.
®
ADAP-KOOL
Drive Operating Instructions
A3
A4/A5
B1 (IP 21-55-66)
(IP 20-21)
(IP 55-66)
3.7
1.1-3.7
5.5-7.5
1.1-7.5
MG.11.L4.02 - ADAP-KOOL
B2 (IP 21-55-66)
5.5-11/
15/
5.5-11
15-18.5
11-18.5/
22-30/
11-18.5
22-37
®
Drive
C1
C2
(IP 21-55-66)
(IP 21-55-66)
18.5-30/
37-45/
22-30
37-45
37-55/
75-90/
45-55
75-90
19
4
4

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADAP-KOOL AKD 102 and is the answer not in the manual?

Questions and answers

Table of Contents