Figure 3-27 Enc82S-Environmental Enclosure Sample Boot - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

Figure 3-27 ENC82S–Environmental enclosure Sample Boot
4) If necessary, install reducer into sample probe output fitting.
5) Install ferrule and nut onto one end of the sample tubing.
6) Insert tubing with ferrule into reducer/sample probe output fitting. Move nut down
onto ferrule, screw onto fitting and tighten.
7) Install ferrule and nut onto other end of the sample tubing.
8) Insert ferrule into sample conditioning module input fitting. Move nut down onto
ferrule, screw onto fitting and tighten.
9) Locate sample output fitting on sample conditioning module.
10) Locate sample input on NGC feed-through assembly and remove sealing screw.
11) Make necessary bends in the tubing to ease installation of the tubing into the
output fitting on the sample conditioning module, and the ferrule and Valco nut
into the input on the NGC feed-through assembly.
12) Insert the tubing with the ferrule into the output fitting on the sample conditioning
module. Move the nut down onto the ferrule, screw onto the fitting and tighten.
13) Remove plastic caps from restrictor coils, sealing screws from feed-through
column vents and sealing screw from sample vent lines.
14) Purge air from the transport tubing by opening the shut-off valve located on the
sample probe.
2101510 Rev. AG
Leave sealing screw in any unused ports. If unused stream
ports are not sealed, moisture can enter the manifold which
can damage the instrument and void the warranty.
Be sure to follow requirements of national and local codes
when performing this purge.
Sample Boot
Page 3–27

Advertisement

Table of Contents
loading

Table of Contents