10) Screw nut onto all-thread until top of nut is level with top of all-thread. Final
tightening may be done after mounting chain is in place.
11) Set the enclosure on top of the pipe in-between the angle iron mounting
brackets. Keep the unit steady on top of the pipe.
12) Wrap mounting chain underneath pipe (see Figure 3-12). Feed chain up through
square retainer hole of angle iron and pull up until most of the slack has been
taken out of the mounting chain.
13) Feed long flat end of the chain retainer (see Figure 3-13) through the middle of a
chain link then move the retainer lock into position where round peg fits into small
round mounting hole.
VIEW A-A
14) Adjust enclosure into final position on the pipe and tighten nut on all-thread
(adjustment assembly) until unit is securely in place.
15) Adjust enclosure position on angle iron if necessary then tighten bolts until
secure.
2101510 Rev. AG
Lift enclosure above meter run, allowing enough clearance to
clear the pipe.
VIEW A
Figure 3-12 ENC82L–Pipe Mount installation
Figure 3-13 ENC82L–Chain Retainer Lock