ABB NGC8206 User Manual page 12

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

Figure 3-12 ENC82L-Pipe Mount installation ................................................................................... 3-13
Figure 3-13 ENC82L-Chain Retainer Lock ...................................................................................... 3-13
Figure 3-14 ENC82L-Optional support leg Overview ....................................................................... 3-14
Figure 3-15 ENC82S-Channel Tubing Installation ........................................................................... 3-16
Figure 3-16 ENC82S-Pipe Mount Split Brackets ............................................................................. 3-16
Figure 3-17 ENC82S- Pipe Mount Assembly ................................................................................... 3-17
Figure 3-18 ENC82S-Pipe Mounted ................................................................................................ 3-17
Figure 3-19 Typical Pipe Saddle Installation ..................................................................................... 3-18
Figure 3-20 Shelf Installation ............................................................................................................ 3-20
Figure 3-21 NGC Mounting ............................................................................................................... 3-21
Figure 3-22 NGC Optional Mounting Flange Pipe ............................................................................ 3-21
Figure 3-23 Sample System Mounting Kits ....................................................................................... 3-22
Figure 3-25 Sample Conditioning Module Line Connections ............................................................ 3-24
Figure 3-26 ENC82L-Environmental Enclosure Sample Boot ......................................................... 3-26
Figure 3-27 ENC82S-Environmental enclosure Sample Boot ......................................................... 3-27
Figure 3-28 Power Communication Outlet Box Assembly ................................................................ 3-29
Figure 3-29 ENC82L Large Enclosure .............................................................................................. 3-30
Figure 3-30 Assembled Power/Communication Assembly ............................................................... 3-31
Figure 3-31 Power Wiring Diagram ................................................................................................... 3-32
Figure 3-32 Suggested RS-232 Wiring Instructions ......................................................................... 3-33
Figure 3-33 Suggested RS-485 Wiring Instructions ......................................................................... 3-34
Figure 3-34 Suggested RS-422 Wiring Instructions ......................................................................... 3-34
Figure 3-35 Carrier/Calibration Gas Bottle Rack Installation ............................................................ 3-35
Figure 3-36 Dual Bottle Rack Assembly ........................................................................................... 3-36
Figure 3-37 ENC82L-Dual Bottle Rack Installation .......................................................................... 3-37
Figure 3-38 ENC82S-Dual Bottle Rack Installation ......................................................................... 3-37
Figure 3-39 Carrier Gas Pressure Regulator with Relief Valve ........................................................ 3-38
Figure 3-40 Carrier Gas Low Pressure Switch Wiring Instruction .................................................... 3-39
Figure 3-41 Calibration Bottle Location ............................................................................................. 3-40
Figure 3-42 Calibration Bottle Location ............................................................................................. 3-41
Figure 3-43 Calibration Gas Pressure Regulator with Relief Valve .................................................. 3-42
Figure 3-44 Calibration Blend Low Pressure Switch Wiring Instruction ........................................... 3-42
Figure 3-45 Carrier and Calibration Gas Connections ...................................................................... 3-43
Figure 3-46 Vent Line Connections on Feed-through Assembly ...................................................... 3-45
Figure 3-47 Catalytic Heater Option in Environmental Enclosure .................................................... 3-47
Figure 3-48 Catalytic Heater Assemblies .......................................................................................... 3-47
Figure 3-49 Thermostat Assembly Installed ..................................................................................... 3-48
Figure 3-50 Regulator and Filter/Drain Assembly Installed .............................................................. 3-48
Figure 3-51 Temperature Probe Installation ..................................................................................... 3-49
Figure 3-52 Electrical Pre-heater Wiring Instructions ....................................................................... 3-50
Figure 3-53 ENC82S Filter/Drain Assembly Installation ................................................................... 3-51
Figure 3-54 ENC82S Catalytic Heater Pre-Heat Wiring ................................................................... 3-52
Figure 3-55 ENC82L Electric Heater Installed in Enclosure ............................................................. 3-53
x

Advertisement

Table of Contents
loading

Table of Contents