3.19 Carrier Gas Regulator Installation
The following instructions are valid for all installations.
3.19.1 Materials
•
•
3.19.2 Instructions
1) Remove the protective cap from the high pressure inlet, if required.
2) Insert the ferrule on the regulator high pressure inlet into the calibration gas
bottle outlet.
3) Screw the nut onto the thread and tighten.
4) Remove the J2 field wiring connector from the NGC termination panel located
inside the rear of the enclosure (see
LOW PRESSURE PORTS
Figure 3-39 Carrier Gas Pressure Regulator with Relief Valve
Page 3–38
Carrier regulator assembly with low pressure switch (see
Installed carrier gas bottle
These instructions assume that the carrier gas bottle has
been installed.
Do not connect the low pressure switch directly to the NGC
without a barrier.
INCREASE
DECREASE
Figure
3-40).
HIGH PRESSURE PORTS
HIGH PRESSURE INLET
MEDIUM PRESSURE PORT
Figure
3-39)
LOW PRESSURE SWITCH
CABLE TO BARRIER
2101510 Rev. AG