Figure 5-9 Termination Panel - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

12) Holding the replacement panel at the opening of the enclosure, reconnect the
ribbon cable to the digital controller into the back of the termination panel J4 and
the analytical processor cable into J12.
13) Insert the termination panel into the enclosure being careful to not pinch the
wires between the mounting stud and the panel.
14) Replace the clear protective overlay into the enclosure on the mounting studs.
PRIMARY COMPONENT SIDE
SECURITY SWITCH
LOCAL SERIAL DATA
CONNECTION
SERIAL PORT 1
J7
TERMINATION
SERIAL PORT 1
1
2
3
4
J8
J5
USB HOST RECEPTICAL
J6
USB CLIENT RECEPTICAL
ETHERNET STATUS INDICATORS
15) Replace the nuts to hold the termination panel in place.
16) Restore J2, J8, J10, J3 and J6 connections, if applicable.
17) Once the unit is reassembled, apply power to the NGC (Step 6).
18) Reinstall the front and rear end caps.
2101510 Rev. AG
Note that the termination panel to the digital controller ribbon
cable pin 1 wire is not red. On the termination panel, the red
edge (pin 1) of cable should plug onto pin 50, the right side
of the plug. The plug is keyed; do not force plug into the
connector.
DIGITAL I/O
J2
J1
S2
1
2
1
2
INPUTS
OUTPUTS
D1
5VDC
POWER
D2
J11
J9
J3
1
3
1
3
8
9
1
2
3
4
5 6
7
8
5
6
7
SECURITY
ENABLED
D12 D11
D13
D4
D3
STATUS
STAT
LAN
LINK

Figure 5-9 Termination Panel

To return the assembly to Totalflow service for warranty or
repair, please contact Totalflow customer service for an RA
number.
Note that since power was removed from this unit, the NGC
will perform start-up diagnostics and stabilize. If the user
has disabled the start-up diagnostics, they should be
enabled and power cycled to the unit. If the power has been
withheld from the unit for an unknown or lengthy period of
time, a complete start-up should be performed.
For more information on enabling the diagnostics in PCCU,
click Diagnostics and then Help.
POWER
ETHERNET
RECEPTICAL
SERIAL PORT 2
TERMINATION
SERIAL PORT 2
9
J10
S1
ANALYTICAL PROCESSOR
CONNECTION
RESET
DIGITAL CONTROLLER
SECURITY
CONNECTION
SWITCH STATUS
SECONDARY COMPONENT SIDE
VR1
J12
J4
Page 5–21
VOLTAGE
REGULATOR

Advertisement