Sample Line(S) To Ngc Inside Of Enc82; Sample Line(S) To Ngc Inside Of Enc82; Materials - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

9) Insert the ferrule into the sample conditioning module input fitting. Move the nut
down onto the ferrule, screw onto fitting and tighten.
10) Locate the sample output fitting on the sample conditioning module.
11) Locate the sample input on the NGC feed-through assembly and remove the
sealing screw.
12) Make the necessary bends in the tubing to ease installation of the tubing into the
output fitting on the sample conditioning module and the ferrule and Valco nut
into the input on the NGC feed-through assembly.
13) Insert the tubing with the ferrule into the output fitting on the sample conditioning
module. Move the nut down onto the ferrule, screw onto fitting and tighten.
14) Remove the plastic caps from the restrictor coils, the sealing screws from the
feed-through column vents and the sealing screw from the sample vent lines.
15) Purge the air from the transport tubing by opening the shut-off valve located on
the sample probe.
16) Insert the tubing with the ferrule into the corresponding input port located on the
NGC feed-through assembly. Move the Valco nut down onto the ferrule, screw
into port and tighten.
17) Repeat for each sample stream.

3.15 Sample Line(s) to NGC Inside of ENC82

3.15.1 Materials

Installed sample conditioning module for each stream.
1/8" SST chromatography grade transport tubing (amount to be determined by
technician based on distance from sample probe to sample conditioning module
and number of sample streams.
2 ea. ferrule and nut (for each sample stream)
1 ea. ¼" NPT to 1/8" reducer or other size as determined from sample probe
output port (for each sample stream)
1 ea. sample conditioning module transport tubing (supplied with sample
conditioning module).
1/16" or larger vent tubing and materials for making connection to 1/16" purge
coil to vent outside of enclosure (provided by customer for each stream)
Heat trace materials provided by customer for each stream
2101510 Rev. AG
Leave the sealing screw in any unused ports. If unused
stream ports are not sealed, moisture can enter the manifold
which can damage the instrument and void warranty.
Be sure to follow requirements of national and local codes
when performing this purge.
Do not over-tighten. After securing tubing, check for gas
leaks.
Sample line(s) being installed to a unit located inside the
ENC82 require making minute changes to the instructions
listed for their installation. The following information and
steps should be noted during the installation.
Page 3–25

Advertisement

Table of Contents
loading

Table of Contents