Figure 3-25 Sample Conditioning Module Line Connections - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

1) Locate the sample input fitting on the sample conditioning module (see
2) Locate the sample output fitting on the installed sample probe.
3) Measure and cut the SST tubing to the required length.
4) Make the necessary bends in the tubing to ease installation of the ferrule and nut
into the sample conditioning module input port.

Figure 3-25 Sample Conditioning Module Line Connections

5) If necessary, install the reducer into the sample probe output fitting.
6) Install the ferrule and nut onto one end of the sample tubing.
7) Insert the tubing with the ferrule into the reducer/sample probe output fitting.
Move the nut down onto the ferrule, screw onto fitting and tighten.
8) Install the ferrule and nut onto the other end of the sample tubing.
Page 3–24
Figure
3-25).
If sample conditioning module and NGC are located inside a
ENC82, review the following sub section,
Connections
information pertaining to this installation.
Tube, ferrule and nut should always enter the connection at a
right angle.
to NGC inside of environmental enclosure, for
Sample Line
2101510 Rev. AG

Advertisement

Table of Contents
loading

Table of Contents