Gas connections

1 Outlet to sample gas cooler (standard)
2 Sample gas inlet (standard)
3 Outlet to gas sampling probe (option)
Figure 7: Gas connections on the rear panel

Sample gas inlet conditions

The sample gas must be non-corrosive, non-flammable and non-
toxic. The utility unit has one gas path.
Sample gas pressure
p
= 70 to 105 kPa (0.7 to 1.05 bar)
abs
Test gas pressure
p
≤ 200 kPa (2 bar)
abs
Note
If gas pressures > 250 kPa are expected, a suitable external
pressure reducer must be connected upstream.
Sample gas flow rate
70 l/h with SCC-S
100 l/h with SCC-C and SCC-F
Sample gas inlet temperature
10 to 50 °C
Note
The relevant data in the gas analyzer data sheets must be
considered as well for the sample handling components.
1
2
4
5
6
4 Test gas inlet 1 (option)
5 Test gas inlet 2 (option)
6 Test gas inlet 3 (option)
Gas connections
The gas connections are PVDF fittings for DN 4 / 6 mm tube.

Connecting the gas lines

Use gas lines made from material that is suited to the
measuring task.
Connect the gas lines to the gas inlet and outlet fittings on
the rear panel.