Download Print this page
ABB NGC Series Quick Start Manual

ABB NGC Series Quick Start Manual

Natural gas analyzers

Advertisement

Quick Links

Comm1 and Comm 2 Pin-outs/Terminations
RS232
RS485
PIN
COMM 1 (J8)
COMM 1 (J8)
1
Power Out
Power Out
2
Ground
Ground
3
Switched Power Out Switched Power Out
4
Operate
Operate
5
Not Used
RRTS
6
Request To Send
Bus +
7
Transmit Data
Bus -
8
Receive Data
No Connection
9
Clear To Send (CTS) No Connection
COMM 2 (J10)
COMM 2 (J10)
1
Power Out
Power Out
2
Ground
Ground
3
Switched Power Out Switched Power Out
4
Operate
Operate
5
Not Used
RRTS
6
Request To Send
Bus +
7
Transmit Data
Bus -
8
Receive Data
No Connection
9
Clear To Send (CTS) No Connection
TERMINATIONS
Comm 1 (J9)
First or Intermediate Unit (RS-485) Pins 2–3
Last or Only Unit (RS-485)
Pins 1–2
RS232
Pins 2–3
Figure 1: Tubing layout
#
Name
1
Carrier gas
2
Cal gas
Feed through
3
assembly
Sample
4
conditioning
module
5
Sample probe
6
Vent lines
Figure 2: NGC Terminal Board
RS422
COMM 1 (J8)
Power Out
Ground
Switched Power
Out
Operate
RTS
Transmit Bus +
Transmit Bus -
Receive Bus +
Receive Bus -
COMM 2 (J10)
Power Out
Ground
Switched Power
Out
Operate
RTS
Transmit Bus +
Transmit Bus -
Receive Bus +
Receive Bus -
Comm 2
(J11)
Pins 2–3
Pins 1–2
Pins 2–3
A B B M E A S U R E M E N T & A N A LY T I C S
NGC series
Quick start guide
Natural gas analyzers
Gas chromatograph products
Save this guide. Refer to the code above to access
User Manuals and other product information.
Safety and compliance information is included with
the device in the shipping packaging.
We reserve the right to make technical changes or
modify the contents of this document without prior
notice. Regarding purchase orders, agreements
shall prevail. ABB does not accept any responsibility
whatsoever for potential errors or possible lack of
information in this document.
   
 
NGC  S ERI ES   Q U I C K  STA RT  G UI DE |  2 1 0 6 23 5 - 0 0 1  ( A A ) 

Advertisement

loading

Summary of Contents for ABB NGC Series

  • Page 1 Sample probe notice. Regarding purchase orders, agreements Vent lines shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.      ...
  • Page 2 Select SAVE and follow instructions. 7. Select Show Tree View (on left) Sample conditioning modules IMPORTANT NOTE: Congratulations, you’ve successfully started up an ABB 8. Select Totalflow from top of tree. transport tubing run can be up to 50 feet. Lengths NGC analyzer! 9.