Ensuring A Successful Installation - Bay Networks BayStack ARN Routers none Installation And Operating Manual

Bay baystack arn routers installing and operating
Table of Contents

Advertisement

Ensuring a Successful Installation

After connecting the ARN to the network, you can ensure a successful installation
by checking the diagnostic LEDs on the front panel of the base module (refer to
Figure
When you power on the ARN, the following sequence of front panel LED activity
should occur:
Table 3-11.
Boot Status
Local Boot
Netboot (attempting)
Netboot (downloading)
Interrupted (using ARN monitor)
If the LEDs on the ARN light in this sequence, your installation is successful.
Contact your network administrator to verify that the ARN is now connected to
the network.
114200 Rev. A
3-1).
All base module LEDs light momentarily; this tests that the LEDs are
operational.
The Run, Boot, and Fail LEDs count through a short, initial startup sequence.
The Pwr (power) LED lights and remains on.
The Run LED begins flashing and continues to flash until the ARN completes
all diagnostic tests.
As the diagnostic procedure tests each module, the LED representing that
module flashes slowly. If the module passes its diagnostic test, the LED
remains on. If the module fails its diagnostic test, the Fail LED remains on
and the module LED flashes rapidly.
After completing the diagnostic testing procedure, the boot process begins.
The Run and Boot LEDs indicate the boot status as shown in
Boot Status LEDs
After the boot process completes, the Run LED lights and the Boot LED turns
off, indicating that the ARN is operational.
Run LED
Boot LED
Off
On
Off
Flashing
Flashing
On
Flashing
Flashing
Operating the ARN
Table
3-11.
3-9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BayStack ARN Routers none and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Baystack arn

Table of Contents

Save PDF