Download  Print this page

Panasonic PV-4601 A Service Manual page 98

Hide thumbs

Advertisement

Table of Contents
(ALIGNMENT 2) MAIN ROD AND LOADING ARM T UNIT
1. Install the Main Rod so that the rib on the Main Rod aligns with the shaft of the
Loading Arm T Unit.
Make sure that the shafts of the Brake Ass'y are positioned as shown in Fig. A3.
Fig. A2
98

Hide quick links:

Advertisement

Table of Contents
loading

  Related Manuals for Panasonic PV-4601 A

This manual is also suitable for:

Pv-4601 bPv-4601-kPv-4651Pv-4651-k