Panasonic PV-4601 A Service Manual page 99

Table of Contents

Advertisement

(ALIGNMENT 3)CAM GEAR, LINK GEAR AND GENEVA GEAR
1. First, install the Geneva Gear, then the Cam Gear as shown in Fig. A4.
2. Turn the Loading Pulley of the Motor Block Ass'y in the direction shown by arrow
in Fig. A5 so that the holes on the Geneva Gear and Cam Gear are aligned with
holes on the Motor Bracket as shown in Fig. A4, A5.
Alternate method :
First, align the hole of the Cam Gear with the hole of the Geneva Gear as shown in
Fig. A5.
Then, carefully install the Cam Gear and the Geneva Gear together onto the Motor
Fig. A3
99

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv-4601 bPv-4601-kPv-4651Pv-4651-k

Table of Contents