VDR-100G3 / G3S Installation Commissioning Form
Complete all relevant sections. Data items must be marked with a " " or "X" in the "OK" field to indicate satisfactory inspection. If a data item is not
applicable to the particular installation, the "Comments" field must be marked "N/A". Dates should be in the dd-mmm-yyyy format (day-month-year, e.g.
12-Nov-2006).
A satisfactory operational status means that all major operating facilities and requirements of the equipment or unit have been tested and found to
function in accordance with the relevant SOLAS regulations and associated IMO performance standards.
Ship Name:
VDR Model:
FRM Model:
Data Items
Items
Date and time (A.861/5.4.1)
Ship's position (A.861/5.4.2)
Speed (A.861/5.4.3)
Heading (A.861/5.4.4)
Bridge audio (A.861/5.4.5)
Communications audio (A.861/5.4.6)
Radar data (A.861/5.4.7)
Echo sounder (A.861/5.4.8)
Main alarms (A.861/5.4.9)
Rudder order & response (A.861/5.4.10)
Engine order & response (A.861/5.4.11)
Hull openings (doors) status (A.861/5.4.12)
Watertight & fire door status (A.861/5.4.13)
Wind speed & direction (A.861/5.4.15)
For further information, please refer to IEC 61996: Shipborne Voyage Data Recorder (VDR) Performance Requirements – Methods of testing and
required test results and/or IEC 61996-2: Part 2 - Simplified voyage data recorder (S-VDR).
VDR Installation Manual
VDR Installation & Commissioning Checklist, Rev 1.2
IMO Number:
VDR Serial No:
FRM Serial No:
YES
NO
N/A
Comments
16
06/10/2008