Controller Boards On The Fuse Box - Rotax 912 i Series Installation Manual

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

Fig. 1
2.1)

Controller boards on the FUSE BOX

See
The EMS grounding cables of the wiring harness (labelled: "Regulator A"
or cables with cable lugs) must be connected to the 3 attachment points of
the EMS ground.
FUSE BOX
Graphic
Fig. 2
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
INSTALLATION MANUAL
Part
1
Multimeter
2
Rectifier regulator A
3
Rectifier regulator B
Fig. 2
and
Fig. 3.
Part
1
EMS ground attachment points
Function
Function
24-00-00
January 01/2012
09544
Page 7

Advertisement

Table of Contents
loading

Table of Contents