Check Sheet Of Wt Construction - JRC NTG337-EL0 Instruction Manual

Fwa system
Table of Contents

Advertisement

6.14. Check sheet of WT Construction

Check the operation of the WT using the check sheet below.
Test procedure
(A) LED operation test
Remove the AC adapter (to turn off the power) and make sure that all the LEDs are off.
-
Insert the AC adapter (to turn on the power) and check the states of the LEDs.
-
(B) Loopback test between the WT and the WT adapter
-
Press the TEST switch on the WT adapter and make sure that the ETHER LED goes
out.
Remove the cable from the WT adapter's PC port and make sure that the ETHER LED
-
goes out.
(C) Receive level
Connect the WT Local Management Tool to the WT and measure the receive level.
-
(D) Position of the AP-RFU in the field of view after direction adjustment
After the direction is adjusted, look into the scope of the Antenna direction adjustment
-
tool to visually check the position of the AP-RFU
WT
Serial number
Test type
Test condition
Remove the AC
adapter.
LED
operation
test
Insert
adapter.
Press the TEST
switch on the WT
adapter.
Loopback
test
between WT and
Remove
WT adapter
cable from the
WT adapter's PC
port.
Receive level
Table 6-1 Check sheet
Confirm that the POW LED on the WT adapter goes out.
Confirm that the ETHER LED on the WT adapter goes
out.
Confirm that the ALM LED on the WT adapter goes out.
Confirm that the POW LED on the WT adapter lights
green.
the
AC
Confirm that the ETHER LED on the WT adapter flashes
green.
Confirm that the ALM LED on the WT adapter flashes at
1-second intervals and then goes out.
Confirm that the ETHER LED on the WT adapter goes
out.
the
Confirm that the ETHER LED on the WT adapter goes
out.
Connect the WT Local Management Tool to the WT and
measure the receive level.
Check item
6-110
Test date
Pass/fail
Measured
value
-
-
-
-
dBm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ntg335-el0Nt337-xl2Ntg337-xl0Ntg337-el2Ntg335-el2

Table of Contents