Download Print this page

JRC NTG337-EL0 Instruction Manual: Check Sheet Of Ap Installation

Fwa system.
Hide thumbs

Advertisement

5.10. Check sheet of AP Installation

You can use the check sheet below to check the operation of the AP.
Procedure
(A) LED operation test
Turn off the AP-IFU and confirm that the "POWER" LED goes out.
-
-
Turn on the AP-IFU and check the states of all the LED.
(B) Alarm operation test
-
Turn on the AP-IFU and cause the "AP power recovery" trap to occur. Confirm
that the message "AP power recovery: Clear" appears in the list of OpS alarms.
(C) Control operation test
-
Run the RFU Reset command from the OpS and cause the "AP RFU-IFU
communication error" trap to occur. Confirm that the message "AP RFU-IFU
communication error: Clear" appears in the list of OpS alarms.
AP
Serial number
Test type
Test condition
LED operation
When power is off
test
When power is on
Alarm
OpS
operation test
Control
Running
operation test
Reset from OpS
*1 The LED lights if an Ethernet cable is connected to ETHER2.
*2 The LED lights if the ETHER1 switch is set at AUTO.
*3 The LED lights if the ETHER2 switch is set at AUTO.
Table 5-2 Check sheet
Confirm that the POWER LED is off.
Confirm that the POWER LED lights green.
Confirm that the IFU STATE LED flashes green.
Confirm that the IFU ALM LED is off.
Confirm that the ETHER1 LED lights green or
flashes.
Confirm that the ETHER2 LED is off. *1
Confirm that the ETHER1 AUTO LED is off. *2
Confirm that the ETHER2 AUTO LED is off. *3
Confirm that the message "AP power recovery:
Clear" appears in the list of OpS alarms.
Confirm
that
RFU
communication error: Clear" appears in the list of
OpS alarms.
5-72
Test date
Check item
the
message
"AP
Pass/fail
RFU-IFU

Advertisement

Comments to this Manuals

Symbols: 0
Latest comments: