Mitsubishi M80 series Connection And Set Up Manual page 521

Hide thumbs Also See for M80 series:
Table of Contents

Advertisement

M800S/M80 Series Connection and Setup Manual
34 Appx.4: EMC Installation Guidelines
(2) Example of surge absorber installation
An example of installing the surge absorber in the machine control panel is shown below.
A short-circuit fault will occur in the surge absorber if a surge exceeding the tolerance is applied. Thus, install a
circuit protection breaker in the stage before the surge absorber. Note that almost no current flows to the surge
absorber during normal use, so a breaker installed as the circuit protection for another device can be used for the
surge absorber.
Panel earth
leakage
Factory power
breaker
Input
power
Grounding
CAUTION
1. The wires from the surge absorber should be connected without extensions.
2. If the surge absorber cannot be installed just with the enclosed wires, keep the wiring length of A to 2m or less.
If the wires are long, the surge absorber's performance may drop and inhibit protection of the devices in the
panel.
3. Surge absorber to be selected varies depending on input power voltage.
IB-1501269-F
Transformer
Circuit
AC reactor
protector
Circuit
protector
A
Grounding plate
Surge absorber installation
Circuit
protector
NC unit
Other device
(panel power
supply, etc.)
Contactor
MC
Power supply
unit
and
drive unit
Other device
(panel power
supply, etc.)
Surge absorber
(Protection across phases/
Protection across each phase's grounding)
484
Control panel
(relay panel,
etc.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800s series

Table of Contents