Mitsubishi M80 series Connection And Set Up Manual page 242

Hide thumbs Also See for M80 series:
Table of Contents

Advertisement

M800S/M80 Series Connection and Setup Manual
7 Connection of Control Unit
(5) Insert the CC-Link cable into the connector of CC-Link unit.
(Note)
Connector of CC-Link unit is two-step structure. It is not different even if attach the cable to
whichever.
(6) Insert the terminator to the connector of CC-Link unit as in the figure.
In the final station, the terminator connector is required.
Terminator
connector
[Noise countermeasures of CC-Link dedicated cable]
When the CC-Link expansion unit is being used, expose the cable by removing a part of the cable sheath and make
sure to use the shield clamp for the exogenous noise countermeasure.
Refer to "4.4 Shield connection to ground" of CC-Link cable wiring manual (published by CC-Link partner
association) for shield wire grounding for CC-Link dedicated cable.
<Related item>
Shield clamp fitting: "EMC Installation Guidelines: EMC Countermeasure Parts: Shield Clamp Fitting"
Control unit
CC-Link dedicated cable
Shield
CC-link cable
205
CC-Link
expansion unit
Connector of
CC-link unit
IB-1501269-F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800s series

Table of Contents