Fujitsu M10 Product Notes page 72

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 3-5     Problems that might occur with XCP 2240 and workarounds (continued)
SPARC M10-
RTI No.
1
4
4S
RTIF2-
x
x
x
140403-001
RTIF2-
x
x
x
140407-001
Fujitsu M10/SPARC M10 Systems Product Notes for XCP Version 2240 ・ March 2015
58
Description
If you connect to the control domain
console by executing the console(8)
command on the XSCF serial terminal
and then execute any of the following
while the control domain console outputs
a message, the "SCF process down
detected" error may occur and the XSCF
may be reset.
- Entering "#" to disconnect the control
domain console
- Executing the console(8) command by
specifying the -f option from another
terminal to forcibly connect to the
control domain console of the physical
partition (PPAR)
- Executing the switchscf(8) command to
switch the master XSCF
- Executing the rebootxscf(8) command
to reset the XSCF
Suppose you attempt to execute the
dumpconfig(8) command to save XSCF
setting information, and then execute the
restoreconfig(8) command to restore the
XSCF setting information in the same
chassis or other chassis. In this case, some
settings may not be saved/restored or
may be excessively restored on other
chassis.
The following settings are not saved/
restored in the same chassis or other
chassis.
- Setting values for power operation at
power recovery, set with the
setpowerschedule -c recover command
- Setting values for enabling/disabling
ASR function, set with the setservicetag
(8) command
- PPAR DR feature setting values set
with the setpparmode -p ppar_id -m
ppar_dr command for XCP 2210 or
later of the SPARC M10-4S.
- Setting values for configuring a power
supply interlocking group, changing its
settings, and enabling/disabling the
power supply interlocking function for
the group, set with the
setremotepwrmgmt(8) command
Workaround
Execute the console(8) command after
connecting to the XSCF via telnet or ssh,
or terminate the console(8) command
after powering off the PPAR.
There is no effective workaround.
[How to restore]
Execute the following procedure.
1. Before saving the XSCF setting
information with the dumpconfig(8)
command, confirm the following
settings.
- Setting for power operation at power
recovery(recover mode)
[Example] Not powering on at power
recovery
XSCF> showpowerschedule -a -m state
PPAR-ID schedule member recover mode
------- -------- ------ ------------
      0 enable
4
- ASR function (Service Tag)
enable/disable setting
XSCF> showservicetag
Enabled
- PPAR DR feature enable/disable setting
[Example] Disabled
XSCF> showpparmode -p 0
--- Omitted ---
PPAR DR(Current) :-
PPAR DR(Next) :off
- Power supply interlocking group
setting
Saving configuration and setting
off

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m10

Table of Contents