Fujitsu M10 Product Notes page 140

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 3-16     Problems resolved in XCP 2080
SPARC M10-
RTI No.
1
4
4S
RTIF2-
x
121219-011
RTIF2-
x
130305-018
RTIF2-
x
x
x
130305-019
RTIF2-
x
130307-001
RTIF2-
x
131001-001
Fujitsu M10/SPARC M10 Systems Product Notes for XCP Version 2240 ・ March 2015
126
Description
The power of a physical partition (PPAR)
may not be disconnected if deleteboard -c
unassign is executed to the system board
that belongs to the PPAR while the
power of the PPAR is being disconnected
using the poweroff(8) command.
An internal error may occur when
performing "Diagnostic tests" when
selecting "BB" with the replacefru(8)
command or executing the testsb(8)
command. If you check the error log at
this time, you can see that "no PSB
available in PPAR" was registered in
"PPAR#30" when the internal error
occurred.
Diagnosis continues even when an error
occurred on the testsb(8) command and
timeout occurs after a two-hour wait.
If any SPARC M10-4S that is specified
with the diagxbu(8) command is not
implemented, the message "PSB#xx-0 is
not installed." showing the PSB No. that
represents the unimplemented SPARC
M10-4S should appear. However, the PSB
No. of the SPARC M10-4S which actually
has been implemented may be
erroneously output.
If the SPARC M10-4S or the crossbar box
is disconnected with the initbb(8)
command, and then all chassis are turned
off and then on again with the XSCF BB
control cable left connected, the chassis
disconnected with the initbb(8) command
will become the master chassis, and the
XSCF settings will be initialized to the
factory defaults.
Workaround
After executing the poweroff(8)
command, confirm that the status field of
the relevant PPAR shows Powered Off
by using the showpcl(8) command. Then,
execute the deleteboard(8) command.
An error occurred in the applicable
SPARC M10-4S and the system board
(PSB) is in an unavailable state. Check the
error log and replace the SPARC M10-4S.
Execute the showboards(8) command in
another session while executing the
testsb(8) command to check the status of
PSB to be diagnosed. An operation will
fail if "Test" is set to other than "Testing"
and "Pwr" is set to "n". In this case, cancel
the testsb(8) command by pressing [Ctrl]
+ [C].
There is no effective workaround.
Execute the showhardconf(8) command
to check the status of the SPARC M10-4S
to which the corresponding PSB No. is
assigned.
The SPARC M10-4S which has not been
implemented is not displayed with the
showhardconf(8) command.
When the corresponding SPARC M10-4S
is displayed, read the PSB No. in the
message "PSB#xx-0 is not installed." as
that of the unimplemented SPARC
M10-4S that was specified when this
command was executed.
Be sure to follow the procedure below
when disconnecting the SPARC M10-4S
and the crossbar box.
1. Execute the initbb(8) command to stop
the target chassis.
2. Turn off the stopped chassis first and
then disconnect the XSCF BB control
cable.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m10

Table of Contents