Operation Panel Test; Modem Test - Ricoh FACSIMILE FAX77 Field Service Manual

Table of Contents

Advertisement

5. Operation Panel Test

1. Enter the test mode. See page 2-22.
2. From the test mode menu, press 4. The operation panel LEDs will light up for 8 minutes. Press Stop at
any time to return to standby.

6. Modem Test

1. Enter the test mode. See page 2-22.
2. From the test mode menu, press 5.
3. Either:
To test a G3 signal, press 1. Go to step 4.
To test a G2 signal, press 2. Go to step 8.
To test a frequency, press 3. Go to step 12.
4. Press the key that corresponds to the signal you want to test.
9600 bps - Press 1
7200 bps - Press 2
4800 bps - Press 3
5. Press Start.
6. When you have finished with this signal, press Stop.
Continued on the next page
2400 bps - Press 4
300 bps - Press 5
2-26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Facsimile fax80Facsimile fax85

Table of Contents