Electro Industries Shark 100S Installation & Operation Manual page 65

Electronic submeter with wifi ethernet capability
Hide thumbs Also See for Shark 100S:
Table of Contents

Advertisement

9. Service: Current Only Measurement (Three Phase)
A
B
C
N
A
B
C
N
Select: "3 EL WYE" (3 Element Wye) in Meter Programming setup.
NOTE: Even if the meter is used for only Amp readings, the unit requires a Volts AN
reference. Please make sure that the Voltage input is attached to the meter. AC
Control Power can be used to provide the reference signal.
Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Ic
Ib
Ia
Ia Ia Ib Ib Ic Ic
(+) (-) (+) (-) (+) (-)
Va Vb Vc Vref L1 L2 PE
20VAC
Minimum*
Doc
#
4: Electrical Installation
Electronic Circuits
Power Supply Inputs
E145721
4 - 15

Advertisement

Table of Contents
loading

Table of Contents