1:Mounting Diagrams - Electro Industries Shark 100S Installation & Operation Manual

Electronic submeter with wifi ethernet capability
Hide thumbs Also See for Shark 100S:
Table of Contents

Advertisement

CAUTIONS!
• Remove the antenna before opening the unit.
• Only use the front cover support if you are able to open the front cover to the
extent that you can fit the front cover support into its base. DO NOT rest the front
cover support on the inside of the meter, even for a short time - by doing so, you
may damage components on the board assembly.
3. Find the 4 Installation Slots and insert screws through each slot into the wall or
panel.
4. Fasten securely - DO NOT overtighten.

3.2.1:Mounting Diagrams

Electro Industries/GaugeTech
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Figure 3.2: Mounting Plate Dimensions
Doc
3: Hardware Installation
E145721
#
3 - 2

Advertisement

Table of Contents
loading

Table of Contents