Chapter 2
Basic Operation
This chapter introduces you to the operation of the Waters 600E Multisolvent Delivery
System. This chapter assumes that you are using the system with other Waters system
components.
2.1 Powering Up the System
Before You Begin
This section provides instructions on powering up your Waters 600E system, including:
•
IEEE-488 component powerup sequence
•
Powering up the stand-alone 600E system
STOP
If this is the first time you are powering up the system, make sure all components in the
system are properly installed (see the Waters 600E Multisolvent Delivery System
Installation and Maintenance Guide).
2.1.1 Powering Up IEEE-488 Components
This section describes:
•
Powering up a 600E system with a data system
•
Powering up a 600E system in PowerLine mode
Note: You must perform the steps in the following procedures in the exact order outlined
to ensure proper operation of your system (data system-based or PowerLine-based). If
you do not perform the exact steps, the data system or PowerLine Controller may not
recognize the other devices on the bus.
Attention: Operate the system with covers installed to ensure proper
ventilation. Failure to operate the system properly will shorten the life
expectancy of some parts and invalidate the warranty.
Powering Up the System
13