Gearcase Assembly; Water Intake Screens; Shift Housing, Gear, And Propeller Shaft Installation; Shift Rod Cover - Evinrude E-TEC E115DPLSCR Service Manual

E-tec series
Table of Contents

Advertisement

GEARCASE ASSEMBLY

Water Intake Screens

Install water intake screens. Tighten screws to a
torque of 60 to 84 in. lbs. (7 to 9.5 N·m).
1. Water intake screen
Shift Housing, Gear, and
Propeller Shaft Installation
Push shifter detent into farthest downward posi-
tion. Tip the rear of the gearcase slightly down-
ward to assist in the installation of the shaft
assembly.
Be sure the thrust bearing and the thrust washer
are in the proper position. Insert the shaft assem-
bly fully into the gearcase while aligning shift
housing pin with hole in forward end of gearcase
housing.
1
1. Pin
GEARCASE – STANDARD ROTATION

Shift Rod Cover

Lubricate a new shift rod cover O-ring with Triple-
Guard grease. Install the O-ring into the shift rod
cover.
IMPORTANT:
in groove.
1
1
001991
1. O-ring
Install pitot tube screw and seal in housing. ("S",
"O" and "M" Type)
1
1. Screw and seal
005427
GEARCASE ASSEMBLY
Make sure O-ring is fully seated
12308
006841
13
327

Advertisement

Table of Contents
loading

Table of Contents