7. Checking and maintenance
72
7.4.3.
1. Follow the procedure in reverse to re-assemble all of the
components.
CAUTION
During inspection and maintenance operations, always
replace all gaskets on the parts removed.
2. Fill the siphon with water.
3. Put the siphon back in place.
4. Carefully open the main water valve, fill the installation, vent it and,
if need be, top it up with water.
5. Check the seals on the gas and water connections.
6. Switch the boiler back on.
T002874-C
After a service complete the checklist.
¼ See chapter: "Checklist for periodic inspection and
maintenance", page 87.
Assembling the boiler
Quinta Pro 30 - 45 - 65 - 90 - 115
09/06/2011 - 123157-AF