Assembling The Boiler - REMEHA Calenta 25s Installation And Service Manual

High-efficiency wall-hung condensing gas boilers
Table of Contents

Advertisement

7. Checking and maintenance
84
7.4.5.

Assembling the boiler

1. Follow the procedure in reverse to re-assemble all of the
components.
CAUTION
During inspection and maintenance operations, always
replace all gaskets on the parts removed.
2. Fill the siphon with clean water up to the mark.
3. Put the siphon back in place.
CAUTION
Mount the vent hose above the siphon.
4. Carefully open the main water valve, fill the installation, vent it and,
T001529-B
if need be, top it up with water.
5. Check the seals on the gas and water connections.
6. Switch the boiler back on.
After maintenance operations, fill in the corresponding
checklist in the maintenance log provided.
Calenta 25s - 28c - 35s - 40c
040412 - 7600585-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Calenta 40cCalenta 28cCalenta 35s

Table of Contents