Commissioning; Control Panel; Additional Guidelines For Commissioning; Putting The Boiler Into Operation - REMEHA Avanta 12v Installation & Service Manual

Avanta range
Table of Contents

Advertisement

1
2
fig. 31

Control Panel

At the time of commissioning, complete all relevant
sections of the Benchmark Checklist located on the
inside back of this document.
fi g. 32 Benchmark Checklist
3
4
5
LTALW7H000036
2.10

Commissioning

2.10.1
Control Panel
The control panel of the Remeha Avanta has 4 function keys
and a LED display. The function keys are used to read or
change the settings and temperatures.
1 = display
2 = [reset] key
3 = [-] key
4 = [+] key
5 = [enter] key
The display has two positions and displays information on the
current operating status of the boiler and any errors. Numbers,
dots and/or letters can appear in the display.
If no key is pressed for longer than three minutes with the
"boiler in stand-by mode", only one dot is lit. With the "boiler
operating", two dots are displayed (Factory default).
• Press any key and the current boiler status and operation
code will appear in the display.
• In the event of a fault, the fault code is displayed instead of
the dots.
2.10.2

Additional guidelines for commissioning

• When commissioning, complete all relevant sections of the
Benchmark Commissioning Checklist, located on the inside
back of this document.
• Work through all the stages of this section, and send a copy
of the completed commissioning details to Broag along with
the completed registration card in the supplied warranty
leaflet.
• The Avanta boiler has been live test fired on the production
line and set up for Natural Gas with an inlet gas
of 17- 20 mbar whilst
require any further adjustments.
The boiler must not be put into operation with a different type
of gas without reference to par. 2.4.2
2.10.3

Putting the boiler into operation

This section details the procedure for putting the boiler into
operation. There are 7 stages to the procedure:
1. Isolating the power supply and opening the front cover;
2. Checking the connections and making the boiler operational;
3. Switching the boiler on and setting the controls;
4. Checking/setting the gas/air ratio at full load;
5. Checking/setting the gas/air ratio at low load;
6. Making the boiler ready for use;
7. Instructing the user.
T002019
26
Remeha Avanta