Commissioning; Putting The Boiler Into Operation - REMEHA Quinta 115 Technical Information

High-efficiency condensing boiler for wall mounted installation output: 18 - 115 kw
Hide thumbs Also See for Quinta 115:
Table of Contents

Advertisement

9

COMMISSIONING

NOTE: Engineer to carryout pre-commissioning checks to ensure that the installation
complies with current regulations
Initial lighting
The boiler is supplied as standard for use with Natural Gas and tested at an operating
pressure of 20 mbar. The boiler must not be put into operation with a different type of
gas without reference to Broag.
The boiler is delivered with a restriction that is suited for H-gas (Ø H gas = 8.6 mm).
If the boiler is connected to L- gas, a different restriction (Ø L gas = 9.8 mm) must be
placed between the gas valve multiblock and the venturi.

9.1 Putting the boiler into operation

1.
Isolate main power supply.
2.
Lower the grey instrument panel cover towards you release two retaining screws
and open instrument panel doors
3.
Unscrew and remove the 2 screws securing the front panel and lift off
4.
Confirm that the gas supply is available, sound and has been vented by others
5.
Check that the electrical connections match the control options (see Par. 8.2).
6.
Open the cap of the automatic air vent to ensure boiler is vented.
7.
Check boiler and installation is full of water vented and at the correct pressure.
8.
Fill the siphon trap with clean water.
9.
When tightening the siphon cup, ensure that the connection to the heat X is not
disturbed
10. Close the instrument box.
11. Check the flue and the combustion air supply connections.
12. Open the gas cock.
13. Connect + side of digital manometer to test point on inlet gas combi block to test
for max/min inlet pressure i.e., max. 30 mbar static, 17 mbar min working
14. Connect flue gas analyser to test point (see Fig. 18)
Fig. 18
Flue gas measure point.
05.W4H.79.00004
Remeha Quinta 115
50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents