Requirements For Water Connections; Requirements For The Central Heating Connections; Requirements For The Condensate Drain; Flushing The System - REMEHA Gas 320 Ace Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 320 Ace:
Table of Contents

Advertisement

4 Before installation
4.3

Requirements for water connections

4.3.1

Requirements for the central heating connections

4.3.2

Requirements for the condensate drain

4.3.3

Flushing the system

4.4

Requirements for the gas connection

14
Gas 320 Ace
Gas 620 Ace
430
860
500
1000
575
1150
650
1300
Before installation, check that the connections meet the set
requirements.
Carry out any welding work required at a safe distance from the boiler.
If using synthetic pipes, follow the manufacturer's instructions.
We recommend installing a central heating filter in the return pipe to
prevent clogging of boiler components.
The drain pipe must be Ø 32 mm or larger, terminating in the drain.
Use only plastic material for the discharge pipe due to the acidity (pH 2
to 5) of the condensate.
Fit a trap in the drain pipe.
The drain pipe must slope down at least 30 mm per metre, the maximum
horizontal length is 5 metres.
Do not make a fixed connection in order to prevent an overpressure in
the trap.
The installation must be cleaned and flushed in accordance with BS 7593
(2019) and BSRIA BG 33/2014.
Before a new boiler can be connected to a system, the entire system must
be thoroughly cleaned by flushing it. The flushing will remove residue from
the installation process (weld slag, fixing products etc.) and accumulations
of dirt (silt, mud etc.)
Important
Flush the heating system with a volume of water equivalent to at
least three times the volume of the system.
Flush the domestic hot water pipes with at least 20 times the
volume of the pipes.
Important
Due to the presence of an aluminium heat exchanger, suitable
chemicals and the correct use of these chemicals should be
discussed with specialist water treatment companies.
Carry out any welding work required at a safe distance from the boiler.
Before installing, check that the gas meter has sufficient capacity. Take
into account the consumption of all appliances. Notify the local energy
company if the gas meter has insufficient capacity.
We recommend installing a gas filter to prevent clogging of the gas
valve unit.
A (mm)
B (mm)
C (mm)
723
1862
2962
1032
2172
3272
1032
2172
3272
1032
2172
3272
7734324 - v.07 - 21092022

Advertisement

Table of Contents
loading

Table of Contents