Ventilation; Requirements For Ch Water Connections; Requirements For Condensate Drain Line; Requirements For Gas Connection - REMEHA Quinta Ace 30 Installation And User Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

4.3

Ventilation

4.4

Requirements for CH water connections

4.5

Requirements for condensate drain line

4.6

Requirements for gas connection

4.7

Requirements for the electrical connections

7684359 - v.06 - 10012019
The installation must comply with BS 5540 (part 1 + 2), BS 6644 and
IGEM/UP/10.
When fitting service shut-off valves, position the filling and drain valve,
the expansion vessel and the safety valve between the shut-off valve
and the boiler.
Carry out any welding work required at a safe distance from the boiler or
before the boiler is fitted.
For filling and tapping the boiler, install a filling and drain valve in the
system, preferably in the return.
Install an expansion vessel in the return pipe.
When installing open-vented systems, the cold feed and expansion tank
heights must comply with the requirements laid down in the Health and
Safety Executive publication PM5. The Quinta Ace boilers require a
minimum static height of 3 m (Quinta Ace 30/45/55/65/90 or 5 m ( 115).
The siphon must always be filled with water. This prevents flue gases
from entering the room.
Never seal the condensate drain.
The drain pipe must slope down at least 30 mm per metre, the maximum
horizontal length is 5 metres.
Condensed water must not be discharged into a gutter.
Before starting work on the gas pipes, turn off the main gas tap.
Before installing, check that the gas meter has sufficient capacity. Take
into account the consumption of all appliances.
Notify the local energy company if the gas meter has insufficient
capacity.
Remove dirt and dust from the gas pipe.
Always perform welding work at a sufficient distance from the boiler.
We recommend installing a gas filter to prevent clogging of the gas
valve unit.
Establish the electrical connections in accordance with all local and
national current regulations and standards.
Electrical connections must always be made with the power supply
disconnected and only by qualified installers.
The boiler is completely pre-wired. Never change the internal
connections of the control panel.
Always connect the boiler to a well-earthed installation.
The wiring must comply with the instructions in the electrical diagrams.
Follow the recommendations in this manual.
Separate the sensor cables from the 230 V cables
4 Before installation
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents