S
1-8
ECTION
GROUNDING THE CHASSIS
1.8.1
Connecting the System Ground (Figure 1-97 - Figure 1-99)
●
From the factory, the SG, ETH and PBXG grounds are located inside the chassis and are connected to
the FG ground (frame ground) on the back of the Chassis-B.
●
Each 9.5" Chassis-B or 19" Chassis-A in the system must be grounded separately following the step
below.
1.
Ground each 9.5" Chassis-B or 19" Chassis-A by connecting a 14 AWG wire from the FG lug on the back
side of the chassis to an electrical service ground (such as a cold water pipe).
Figure 1-97:
.
Figure 1-98:
Chapter 1
LOCATION OF GROUNDING LUG ON 9.5" CHASSIS-B
LOCATION OF GROUNDING LUG ON 19" CHASSIS-A
Chapter 1 - Installing the Chassis
Ground
1 - 73