Grounding And Ac Cabling; Grounding The Ksu; Ac Power Requirement; Table 2-5 Power Requirement - NEC SL1100 Hardware Manual

Communication system
Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100

1.5 Grounding and AC Cabling

The ETH (Earth Ground Lug) is located near the power supply on each KSU. The Sub-Cover must be
opened in order to access to it.

1.5.1 Grounding the KSU

Ensure all Main and Expansion KSU(s) are powered off and unplug the AC cord.
In each KSU, connect the ETH lug to the verified grounding point using a minimum cable size of
14AWG (Φ2.0 mm) wire.
Screw
ETH Lug
• The grounding cable is supplier-provided.(not attached to the system)
1. Loosen the screw.
2. Insert a grounding wire (user supplied).
3. Tighten the screw.
4. Connect the grounding wire to earth ground.
Proper grounding is very important to protect the system from external noise
and to reduce the risk of electrocution in the event of a lightning strike.

1.5.2 AC Power Requirement

A dedicated 100V-120V/220V/230V/240V 50/60Hz circuit located within two meters of the KSU is
required. A separate dedicated AC outlet is necessary for each KSU.
Double Pole/Neutral Fusing
(Power supply fuses are located at both the L and N side.)
Power Requirement
Power Consumption
Input Voltage (Rated Voltage)
Frequency
Phase and Wire
2-12
To Earth

Figure 2-19 ETH Lug

Table 2-5 Power Requirement

110VAC
120VAC
110 VAC@15 A
120 VAC@15 A 220 VAC@15 A 230 VAC@15 A 240 VAC@15 A
Main KSU =
Main KSU =
128 VA
130 VA
3 KSU Total =
3 KSU Total =
384 VA
390 VA
90 VAC to 264 VAC (100VAC/120VAC/220VAC/230VAC/240VAC)
47 Hz - 63 Hz (Rated Frequency: 50/60 Hz)
220VAC
230VAC
Main KSU =
Main KSU =
154 VA
154 VA
3 KSU Total =
3 KSU Total =
462 VA
462 VA
Single Phase, 2 Line + PE Type
ISSUE 1.0
240VAC
Main KSU =
156 VA
3KSU Total =
468 VA
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents