Installing The Gigabit Ethernet Switch Blade - NEC ux5000 Hardware Manual

Hide thumbs Also See for ux5000:
Table of Contents

Advertisement

Chapter 2 - Blade Installation and Startup
When a Main blade is initialized, it assigns the first blade ports 1-8. When subsequent add-on blades are
recognized, the system assigns port numbers on a first-come-first-serve basis. If you wish to have sequential
port numbers, insert each add-on blade, one at a time, into the system without adding any other type of blade.
When a blade is removed, the port numbers are not automatically removed. They can be removed by
accessing the Main blade GUI.
The IP address, subnet mask, and gateway address of the Main blade will be assigned in Program 10-55.
Stacking 3 GSWU blades to form a 20-port switch is restricted to a single system location. The grouping is not
allowed across a network/CygnilLink.
The VOIPDB daughter board, which is required in order for IP terminals to communicate with non-VoIP
UX5000 terminals, as well as to place or receive outside calls, must be connected to either a switching hub or
to the Router blade.
2.6.3.1

Installing the Gigabit Ethernet Switch Blade:

1.
2 - 62
9.5"
19" Chassis
Chassis
w/CCPU
2
3
Figure 2-29:
Install the GSWU into any available slot.
Blade Maximum's
19" Chassis
19" Chassis
w/o CCPU
3
GSWU BLADE
System Max.
x4
w/Networking
12
12
Chapter 2

Advertisement

Table of Contents
loading

Table of Contents