Led Indications; Installing The Voip Blade - NEC ux5000 Hardware Manual

Hide thumbs Also See for ux5000:
Table of Contents

Advertisement

Chapter 2 - Blade Installation and Startup
2.4.5.1

LED Indications

ACT (LED 1)
LINK10_100
(LED2)
LINK1000
(LED3)
DUPLEX
(LED4)
The following table shows the LED indication when transmitting or receiving data on CN1.
LED
ACT (LED1)
DUPLEX (LED4)
LINK1000 (LED3)
LINK10_100 (LED2)

Installing the VoIP Blade:

2.4.5.1
1.
2.
3.
2 - 36
LED
Link activity or data
transmission and reception.
10Base-T/100Base-TX link
speed indicator.
1000Base-T link speed
indicator
Duplex Status
Auto Negotiation Mode
100Mbps
1000
M bps
half
full
ON
ON
ON
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
Do not remove or install this daughter board with the
power on.
With the system power off, install the VOIPDB onto the CCPU.
Insert the CCPU into the CCPU slot in the Controlling chassis.
UX5000 Central Processing Unit (CCPU) Blade (Figure 2-4 - Figure 2-5)
Refer to
- P/N 0911001
(page 2-15) for more details.
Connect the VOIPDB to the 4RTU blade or to an external switching hub using an ethernet
cable.
Function
On Green
Flashing
On Red
LED 1=On
LED 2= Off
LED 3=Off
On Red
On Yellow
Link Up
10Mbps
half
full
ON
ON
OFF
ON
OFF
OFF
OFF
OFF
LED
Operation Status
Status
Link up completed
Data being transmitted/
received.
100Base-TX link up
When:
Link up 10Base-T
1000Base-T link up
Full duplex operation
Force Mode
100Mbps
1000
M bps
half
full
ON
ON
ON
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
10Mbps
half
full
ON
ON
OFF
ON
OFF
OFF
ON
ON
Chapter 2

Advertisement

Table of Contents
loading

Table of Contents