Figure 30. Installing the 1.8-inch SSD carrier
Next steps
1.
Install the SSD into the carrier.
2.
Install the sled into the enclosure.
3.
Follow the procedure listed in the After working inside your system section.
Related links
Safety instructions
Before working inside your system
Removing a sled
Removing the 1.8-inch solid state drive
Installing the 1.8-inch solid state drive
Installing a sled
After working inside your system
SATA cable removal and installation for the sled
Each PowerEdge C6320p sled has two SATA cables connected to the onboard controller.
•
The solid-state drive (SSD) SATA cable is used to connect the onboard SSD to the onboard controller.
•
The SATA cable is used to connect the onboard controller to the hard drive backplane through the midplane. This will control up
to six hot swappable hard drives.
77