Effective Frame Per Second & Pipeline Operation Formulas - Microscan Visionscape HE1600T Manual

Smart camera
Hide thumbs Also See for Visionscape HE1600T:
Table of Contents

Advertisement

Chapter
1
Introduction
Effective Frame Per Second & Pipeline Operation
Formulas
Use the following formula to calculate effective FrameRatePerSecond in a
Visionscape
EFPS =
Where VS Overhead is typically:
Interrupt Latency + Framework Overhead = 0.5 msec max
Or
EFPS =
In Table 1–2, EFPS is given in PowerStrobe with 1msec Integration time and Job
in full pipeline, meaning that the Job tools + idle processing time, i.e., less than
(IT + VFT + 0.5) above.
Full Pipeline = (AVT AVP Processing Time + IDT Inspection Idle Time +
LossLess Connection Overhead) < (IT + VFT + VSO) idle time is defaulted to
3% of the Inspection Time as defined in the VisionSystemStep property page.
Table 1–2 lists Visionscape
frames per second.
1-6
®
Job:
----------------------------------------------------------------------------------------------------
(IT IntegrationTime + VFT VendorFrameTime + VSO VS Overhead) in msec
1000.0
-----------------------
(IT + VFT + 0.5)
®
Smart Camera HE1600T models, modes, and
Visionscape® Smart Camera HE1600T Guide
1000.0
Rev. 1H, Mar 2009

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Visionscape HE1600T and is the answer not in the manual?

Table of Contents